February 1st, 2011-Worked on drawings on AutoCAD. Talked to mentor after school.

February 4th, 2011-Worked on CAD drawings. Looked at materials to gear cage.

February 9th, 2011-Looked at electric motors and gears online.

February 11th, 2011-Worked on exhibit poster.

February 16th, 2011-Added aluminum sheet piece to bottom of pincers. Worked on exhibit poster

February 21st, 2011-Started working in lab. Outlined aluminum

February 25th, 2011-Cut aluminum with shears for gear cage and bent it to correct dimensions

March 1st, 2011-Worked on exhibit poster. Drilled holes in all my gears for the axels

March 4th, 2011-Worked on exhibit poster. Drilled hole for wires from electric motor and made holder for motor

March 9th, 2011-Updated CAD drawings. Worked on exhibit poster

March 14th, 2011-Worked on exhibit poster and looked online for high density polyethylene

March 18th, 2011-Ordered HDPE to create the pincers. Worked on exhibit poster

March 23rd, 2011-Outlined HDPE for cutting. Left early for sailing

March 25th, 2011-Cut HDPE into the four pincers. Created FPU outline

March 29, 30, 31, April 1-FPUs

April 4th, 2011-Worked on exhibit poster and self evaluation