February 1st, 2011-Worked on drawings on AutoCAD. Talked to mentor after school.
February 4th, 2011-Worked on CAD drawings. Looked at materials to gear cage.
February 9th, 2011-Looked at electric motors and gears online.
February 11th, 2011-Worked on exhibit poster.
February 16th, 2011-Added aluminum sheet piece to bottom of pincers. Worked on exhibit poster
February 21st, 2011-Started working in lab. Outlined aluminum
February 25th, 2011-Cut aluminum with shears for gear cage and bent it to correct dimensions
March 1st, 2011-Worked on exhibit poster. Drilled holes in all my gears for the axels
March 4th, 2011-Worked on exhibit poster. Drilled hole for wires from electric motor and made holder for motor
March 9th, 2011-Updated CAD drawings. Worked on exhibit poster
March 14th, 2011-Worked on exhibit poster and looked online for high density polyethylene
March 18th, 2011-Ordered HDPE to create the pincers. Worked on exhibit poster
March 23rd, 2011-Outlined HDPE for cutting. Left early for sailing
March 25th, 2011-Cut HDPE into the four pincers. Created FPU outline
March 29, 30, 31, April 1-FPUs
April 4th, 2011-Worked on exhibit poster and self evaluation
Monday, April 4, 2011
Tuesday, March 29, 2011
Testing Evidence
![]() |
| Testing the strength and durability of the aluminum sheet. |
![]() |
| Testing the cameras for the ROV, which will enable the operator to see the claw. |
![]() |
| Continued testing of the strength and durability of the aluminum sheet. |
Friday, February 4, 2011
February Log 2/1 2/2 2/3 2/4
On the 1st and 2nd I helped my partners do some work in the lab, mainly Ryan with the control box. On the 3rd I revised the construction packet after talking to Ms. Green. Today, the 4th, I am working on the platform component for the connection between the claw and the ROV.
Friday, January 21, 2011
Construction Photos
![]() |
| Different gears to be used for the gearing system |
![]() |
| Close up picture of the electric motor |
![]() |
| Picture of bolts, electric motor, and two axels |
| 1/32 Aluminum sheet metal for the gear cage |
![]() | ||||||||||||||||||
| DSM Engineering Plastic, which will be used for the pincers |
Friday, January 7, 2011
January Log 1/4, 1/6, 1/7
On Monday the 3rd I was absent. On the fourth, my group along with Joe Russel, went to the systems lab to test one of the motors to see how much force it could exert. Wednesday the 5th I was absent. Thursday the 6th I looked over some of my CAD drawings and made some adjustments. On Friday the 7th my team and Josh Wills tested the ballast tank for our ROV.