Friday, January 21, 2011

Construction Photos

Different gears to be used for the gearing system
Close up picture of the electric motor
Picture of bolts, electric motor, and two axels
1/32 Aluminum sheet metal for the gear cage

DSM Engineering Plastic, which will be used for the pincers

Friday, January 7, 2011

January Log 1/4, 1/6, 1/7

On Monday the 3rd I was absent. On the fourth, my group along with Joe Russel, went to the systems lab to test one of the motors to see how much force it could exert. Wednesday the 5th I was absent. Thursday the 6th I looked over some of my CAD drawings and made some adjustments. On Friday the 7th my team and Josh Wills tested the ballast tank for our ROV.